[SOLVED] IIE485 Project 2- Capstone Fall25

100.00 $

Category:
Click Category Button to View Your Next Assignment | Homework

You will receive the following solution file(s) instantly after successful payment:

zip file icon P2-tsbt3c.zip (429.4 KB)
Assignment Instructions Updated Recently? Submit Below and we will provide new Solution!
Submit New Instructions
πŸ”’ Securely Powered by:
Secure Checkout
5/5 - (2 votes)

Microsoft Project Assignment

Upload two files:

  1. Your Microsoft Project (.mpp) file

  2. A PowerPoint, PDF, JPG, or other image showing the resource utilization table or bar graph with the time each team member needs to contribute.

To qualify for full marks, your Project Plan must include (for all tasks):

  • WBS#

  • Task Name

  • Duration

  • Start and Finish

  • Predecessors

  • Resource Names (actual names of your ASU and sponsor team members)
    For sponsor vendors, use the vendor name if you don’t know the person’s actual name.

  • Cost

  • Early Start and Early Finish

  • Late Start and Late Finish

  • Slack

Scoring notes:

  • Include all items above for all tasks (10 points). Points are deducted for missing items.

  • Make sure the critical path is clearly identified in the Gantt chart (5 points).

  • Provide an image of the resource table or resource chart (5 points). You can upload the image itself or paste it into PowerPoint and upload the PPT.


MS-Project Rubric (screenshot 1)

Criteria 1: WBS in MS Project β€” 10 pts

Full Marks (10 pts):
Contains all items: WBS#, Task Name, Duration, Start, Finish, Predecessors, Resource Names, Cost, Early Start, Early Finish, Late Start, Late Finish, Slack.

Partial Marks (10 to >0 pts):
Score decreases based on number of missing items (examples shown in the rubric: 1 missing β†’ 9 pts; 2 missing β†’ 7 pts; 3 missing β†’ 5 pts; 4 missing β†’ 2 pts).

No Marks (0 pts):
If 5 or more items are missing from the list above.

Criteria 2: Gantt Chart β€” 5 pts

Full Marks (5 pts):
Gantt chart present and critical path clearly defined.

Partial Marks (3 pts):
Gantt chart present, but critical path not clearly defined.

No Marks (0 pts):
Gantt chart missing.

Criteria 3: Resource Table or Resource Chart β€” 5 pts

Full Marks (5 pts):
Resource table/chart present and complete.

Partial Marks (3 pts):
Resource table/chart present but not complete.

No Marks (0 pts):
Resource table/chart missing.

Total Points: 20

  • P2-tsbt3c.zip